This hall bathroom renovation in Randolph, NJ called for gutting the bathroom down to the studs. A new toilet, tub, tile, vanity, sink and mirror were installed.
Before Before Before Before Before Gutted Down to the Studs Cement Board Installed RedGard Applied and Tile being Installed New Vinyl Plank Flooring Beautiful New Tile and Tub